Sized to standard, every timeThe mount's stroke factor and Euler buckling pick the rod from the NFPA ladder, compressive stress checks it, hoop stress sets the wall, a long stroke earns its stop tube — the checks our engineers run, computed live.
Every option, on the modelThe seven NFPA mounts, welded or tie-rod, five rod ends, oversize or double rod, cushions per end, SAE, NPT or code 61 ports at any clock position, seals matched to your fluid, a transducer, the finish — pick it and watch the parts appear, on the 3D and the GA drawing.
Quoted in minutes, built in weeksQuantity breaks at 10, 25 and 50. Send the request straight from the configurator with the spec and the drawing. Standard lead time 3–4 weeks; rush programs available.